Racecourse Crescent — completed McPhillips project

Racecourse Crescent

STAR Housing·£1.2M·Shrewsbury, Shropshire·January 2025 – August 2025

Thirteen affordable homes at Racecourse Crescent, Shrewsbury.

STAR Housing appointed McPhillips to resume the Racecourse Crescent development after the previous contractor went into liquidation in February 2024, halting construction. The £1.2 million scheme — a collaboration between McPhillips, STAR Housing and Shropshire Council — delivered 13 energy-efficient homes (six one-bedroom flats and seven two-bedroom houses) for local affordable rent, along with a new external access road and utility connections.

The homes feature air source heat pumps, photovoltaic panels, electric-vehicle charging points, and permeable road surfacing with solar-powered street lighting. The original planning permission was modified from mixed tenure to 100% affordable rental housing to mitigate the risks arising from the dual-contractor construction history.

13
Energy-efficient homes
100%
Affordable rental housing
12-year
NHBC warranty

The challenge

With multiple buildings left at different stages of construction, McPhillips carried out comprehensive dilapidation surveys — room-by-room photographic documentation across every house — to establish a baseline and schedule the remaining first-fix-to-completion works across plumbing, electrical, plastering and finishing. Provisional cost estimates had to be developed for unknown elements where the original contractor's information was unavailable, partial scaffolding required careful removal, and civil engineering formed a significant part of the outstanding scope.

Throughout, deliveries and vehicle movements had to be coordinated through a busy residential area while maintaining public access to Monkmoor Recreation Ground and managing local resident concerns following the earlier delays.

Racecourse Crescent — The challenge
Racecourse Crescent — The solution

The solution

Close liaison between McPhillips, STAR Housing and Shropshire Council enabled quick, joint problem-solving. Additional space was rented on the adjacent Shrewsbury Town Council car park for site accommodation and materials storage, the site was securely hoarded with controlled access, and a full-time banksman managed traffic on the Monkmoor Recreation Ground access road.

A collaborative project-management model proved central — regular site meetings and joint problem-solving between STAR Housing and McPhillips, supported by an integrated team of contracts manager, contracts director, site manager, development manager and site agent. A comprehensive stakeholder-engagement plan kept local residents and recreation-ground users informed, deliveries were scheduled to avoid peak times, and detailed first-fix-to-completion mapping across every trade — with NHBC certification and building-control sign-off prioritised — kept the 28-week completion on programme.

“
This project has been by far the easiest of the completion projects I've worked on thanks to collaboration. Regular site meetings with a joint problem-solving approach, strong site manager leadership and an integrated team structure all contributed to the project being delivered on time and on budget despite the complexity of inherited incomplete construction.”
Mark Feeney
Senior Development Manager, STAR Housing

The result

Early engagement got the stalled scheme back on track, delivered on time and on budget. NHBC certification was completed, providing the 12-year insurance cover required for social housing, and building-control sign-off confirmed full regulatory compliance for handover to the housing association.

Housing-association handover standards were met — enabling immediate rental advertising via the Home IT platform — and Homes England funding was secured for additional project costs, reflecting funder confidence in the collaborative approach.

Racecourse Crescent — The resultRacecourse Crescent — The result — detail
“
We understand the challenges and disruptions our community has faced due to the delays. We appreciate the patience and support of our customers and stakeholders. With construction now in full swing, we are looking forward to delivering these much-needed homes and enhancing the local area.”
Harpreet Rayet
Managing Director, STAR Housing

Project gallery.

Related case studies.

All projects
Oakwood Extracare
View project

Oakwood Extracare

Residential housing·£9.06M·Wellington

McPhillips was commissioned by The Wrekin Housing Trust to design and build a new 63 apartment 6400m2 three storey extracare facility on…

Ifton Green
View project

Ifton Green

Residential housing·£6M·St Martins

McPhillips was principal contractor on the demolition of a former primary school, site remediation, design and construction of 35 timber…

Ellesmere Wharf
View project

Ellesmere Wharf

Residential housing·£4M·Ellesmere

McPhillips as principal contractor undertook the design and build contract of 23 timber framed residential plots with associated external…

60
Years · Est. 1964
McPhillips team planting trees with local schoolchildren

Building with purpose

60+ years of supporting you.

Over six decades we’ve shaped countless communities and built spaces they can be proud of. Explore the McPhillips’ Way – the people behind our projects and the principles that drive us.

Click to access the login or register cheese