Balfour Beatty appointed McPhillips to repair the B429 Sheep Bridge in Cherrington, Telford, a single span masonry arch bridge over the River Meese with two flood relief tunnels.
The existing scour protection was being undercut, with evidence that water was travelling beneath parts of the structure, threatening the bridge’s stability and longevity. The scope included stabilising and strengthening the arch support to repair undercutting, installation of scour protection works, removal of existing defective concrete aprons, and replacement with mass concrete alongside and underneath the abutments of the central arch. Isolated spalled and missing stonework in the central arch and flood relief arches were replaced, balancing modern structural requirements with heritage preservation.
The project presented unique challenges of working in a live river environment with strict environmental controls necessary to protect the river ecosystem, particularly fish populations, with work requiring completion before the fish spawning. The remote location had no mobile phone signal, requiring all communication to be managed via email, complicating coordination and emergency response protocols.
It was a privilege having McPhillips work for us on the Sheep Bridge project. There was constant collaboration throughout the project with all parties, completing the works on time and on budget while ensuring the correct EA procedures were being followed and bespoke permits in place.”
Dudley Metropolitan Borough Council appointed McPhillips as principal contractor to deliver comprehensive public realm improvements…
In early 2017 Shropshire Council awarded McPhillips five highway improvement schemes to key junctions in Shrewsbury. The individual work…
New and extended bus lanes with signal priority on a key Sprint corridor, delivered in time for the Birmingham 2022 Commonwealth Games.