Balfour Beatty·£200,840·Cherrington, Telford·August 2025 – October 2025

Repair of the B429 Sheep Bridge at Cherrington, Telford.

Balfour Beatty appointed McPhillips to repair the B429 Sheep Bridge in Cherrington, Telford, a single span masonry arch bridge over the River Meese with two flood relief tunnels.

The existing scour protection was being undercut, with evidence that water was travelling beneath parts of the structure, threatening the bridge’s stability and longevity. The scope included stabilising and strengthening the arch support to repair undercutting, installation of scour protection works, removal of existing defective concrete aprons, and replacement with mass concrete alongside and underneath the abutments of the central arch. Isolated spalled and missing stonework in the central arch and flood relief arches were replaced, balancing modern structural requirements with heritage preservation.

The project presented unique challenges of working in a live river environment with strict environmental controls necessary to protect the river ecosystem, particularly fish populations, with work requiring completion before the fish spawning. The remote location had no mobile phone signal, requiring all communication to be managed via email, complicating coordination and emergency response protocols.

The challenge

Working in a live river environment demanded solutions for working in unstable riverbed conditions whilst managing water flow, with a Porter Dam requiring twice-daily checks to prevent failures caused by river force, which on one occasion tore a large hole requiring immediate repair.

Strict environmental constraints were necessary to protect the river ecosystem, particularly fish populations and to prevent the spread of invasive species. Communication difficulties in the remote location with no mobile phone signal required all communication to be managed via email, complicating coordination and emergency response protocols. Load-bearing considerations involved using a nine-ton excavator on a bridge with a posted 3-ton limit, requiring advance structural surveys and careful management of load distribution. Access limitations beneath the bridge created confined spaces limiting access for concrete pumping equipment, requiring alternative material handling solutions.

Sheep Bridge — The challenge
Sheep Bridge — The solution

The solution

McPhillips developed a tailored approach addressing the unique challenges presented by the Sheep Bridge environment.

Comprehensive environmental management recognised the critical importance of protecting the river ecosystem through a fishery permit process with careful removal and relocation of fish using electric stunning techniques, with all fish safely scooped out before work began in the river.

The team rigorously monitored and removed invasive American crayfish, which carry disease harmful to native species, and implemented daily decontamination protocols to prevent cross- site contamination. Phased construction methodology maintained structural stability throughout works through carefully sequenced construction approach, dividing the bridge into four quadrants that could be completed sequentially whilst maintaining structure integrity.

Controlled water management involved Porter Dam installation with 4 tons of sandbags allowing daily water pumping with twice-daily checks to prevent failures, with immediate repairs made at no extra cost when river force tore a large hole.

Specialised material application used high-strength concrete allowing walk-on strength within two hours, crucial for the tight schedule and challenging river environment, with concrete mix specifically selected for performance characteristics in damp conditions.

Adaptable communication protocols implemented daily morning briefings despite lack of phone signal, reviewing tasks, risks and safety to enhance team focus and reduce accident potential whilst ensuring alignment with daily objectives.

Collaborative stakeholder engagement with Balfour Beatty and local suppliers such as SMC Concrete ensured timely concrete delivery and quality control despite communication challenges.

“
It was a privilege having McPhillips work for us on the Sheep Bridge project. There was constant collaboration throughout the project with all parties, completing the works on time and on budget while ensuring the correct EA procedures were being followed and bespoke permits in place.”
Simon Middleton
Schemes manager, Balfour Beatty

The result

The Sheep Bridge repair project was completed successfully achieving all primary objectives with zero defects and demonstrating effective management of complex civil engineering works in environmentally sensitive settings.

The bridge’s undercutting issues were fully addressed with new scour protection properly installed to prevent future water infiltration beneath the structure, restoring structural integrity. All works were completed in accordance with environmental permits and requirements, protecting the river ecosystem and preventing the spread of invasive species.

Historical aspects of the bridge were maintained through careful replacement of isolated spalled and missing stonework. The project was completed with no safety incidents despite the challenging river environment and heavy machinery requirements.

Sheep Bridge — The resultSheep Bridge — The result — detail

Project gallery.

Related case studies.

All projects
Brierley Hill
View project

Brierley Hill

Infrastructure & civil engineering·£6.73M·Brierley Hill

Dudley Metropolitan Borough Council appointed McPhillips as principal contractor to deliver comprehensive public realm improvements…

Shrewsbury Integrated Transport Package: Key Junctions
View project

Shrewsbury Integrated Transport Package: Key Junctions

Infrastructure & civil engineering·£2.7M·Shrewsbury

In early 2017 Shropshire Council awarded McPhillips five highway improvement schemes to key junctions in Shrewsbury. The individual work…

A34 sprint package D works
View project

A34 sprint package D works

Infrastructure & civil engineering·£3.47M·A34

New and extended bus lanes with signal priority on a key Sprint corridor, delivered in time for the Birmingham 2022 Commonwealth Games.

60
Years · Est. 1964
McPhillips team planting trees with local schoolchildren

Building with purpose

60+ years of supporting you.

Over six decades we’ve shaped countless communities and built spaces they can be proud of. Explore the McPhillips’ Way – the people behind our projects and the principles that drive us.

Click to access the login or register cheese