York’s Bridge

Walsall Metropolitan Borough Council·£5.14M·Pelsall, Walsall·August 2024 – April 2026

A new 40-metre road bridge over the canal at Pelsall.

McPhillips was principal contractor for Walsall Metropolitan Borough Council on a new road bridge over the Wyrley & Essington Canal, with associated carriageway improvements along Norton Road in Pelsall. The scheme delivered a new 40-metre, two-way bridge with dedicated pedestrian access, improved visibility, enhanced lighting, revised access to nearby properties and the Fingerpost pub, and parking bays for users of the adjacent common land.

The original single-lane humpback brick arch bridge — dating to the mid-1800s and sitting alongside a Site of Special Scientific Interest — had become unsuitable for modern traffic volumes, but remains in place for pedestrian and private access.

40m
Two-way bridge span
76t
Heaviest beam lifted
350t
Crane for the beam lift

The challenge

The confined site sat between a residential area, the Fingerpost pub and a triple SSSI, presenting environmental, technical and logistical challenges throughout. Great crested newts were present on site, nesting birds delayed tree removal, and bat surveys were required.

Outdated plans — the original design was 12 years old — and unexpected ground conditions forced significant on-site redesign, including a Severn Trent sewer discovered within the bridge footprint with its manhole cover on the line of the new retaining wall. Throughout, road access for the pub and local residents and pedestrian access to the canal towpath had to be maintained at all times.

York’s Bridge — The challenge
York’s Bridge — The solution

The solution

To clear the site quickly, traditional newt trapping was replaced by trained sniffer dogs, supported by around 1,350m of exclusion fencing and purpose-built hibernacula for safe relocation, while towpath access was kept open on a floating pontoon and road closures held to two main periods. Rather than divert the Severn Trent sewer — a three-month lead — the team designed a bespoke reinforced-concrete bridging cover slab that preserved access to the manhole, saving significant time through close collaboration with Severn Trent and Walsall MBC.

The new bridge sits on replaceable rubber bearings that can be hydraulically jacked for maintenance, and its heaviest 76-tonne beam was placed by a 350-tonne crane in a critical, carefully-rigged lift.

“
We're proud of what we have delivered here and of the relationships we built with Walsall Metropolitan Borough Council, the Canal & River Trust and the local community. The new bridge is a real and lasting improvement for Pelsall and we hope residents and road users enjoy the benefits for many years to come.”
Andrew Dunham
Director, McPhillips

The result

Delivered by a core team of six alongside up to 25 mostly-local sub-contractors, the new bridge was completed and well received locally, with continuous access maintained for the Fingerpost pub, nearby cottages and canal towpath users throughout the works. The original brick arch bridge is retained for pedestrians and private access.

York’s Bridge — The resultYork’s Bridge — The result — detail
York’s Bridge — Mar 2025 — during works
York’s Bridge — May 2026 — complete
Mar 2025 — during works May 2026 — complete

Project gallery.

Related case studies.

All projects
Jackfield Stabilisation
View project

Jackfield Stabilisation

Infrastructure & civil engineering·£9M·Ironbridge Gorge

Ground stabilisation of a landslip-prone flank at Jackfield, Ironbridge.

Shawbirch Island Improvements
View project

Shawbirch Island Improvements

Infrastructure & civil engineering·£1.59M·Telford

Improvements to the 4-leg Shawbirch Island on the A442 and B4394 northern approach to Telford were undertaken as part of the Growth Point…

Shrewsbury town centre improvements
View project

Shrewsbury town centre improvements

Infrastructure & civil engineering·£1.7M·Shrewsbury

Pedestrian and public realm upgrades across Shrewsbury town centre: Murivance, Claremont Bank, Town Walls and Belmont, and the…

60
Years · Est. 1964
McPhillips team planting trees with local schoolchildren

Building with purpose

60+ years of supporting you.

Over six decades we’ve shaped countless communities and built spaces they can be proud of. Explore the McPhillips’ Way – the people behind our projects and the principles that drive us.

Click to access the login or register cheese