McPhillips were commissioned by Avove, a leading infrastructure services and engineering company, to undertake the replacement of an existing 225mm diameter pipe bridge which was damaged and in need of repair.
Specific materials were used for this project:
We faced numerous challenges during the works, probably most significantly the challenge of working within a flood plain adjacent to a fast flowing watercourse during the flood season.
We chose ductile iron due to its robustness and adaptability to various geographical configurations and types of environments.
The overall solution of diverting the pipe bridge was completed on budget and within the specified timescales. We worked in close liaison with the client in order to address issues as they arose and presented solutions promptly.
Using a 300mm diameter ductile iron pipe for above ground foul water gravity drainage with expansion joints seemed daunting initially, however the McPhillips team met the challenge head on to produce a successful end result. The works were completed to the full satisfaction of the client.
The Shifnal Town Centre improvement project was designed to create a more pedestrian-friendly area for shoppers and businesses, slow down…
A new landscaped community green space replacing stepped access, with a play area, improved disabled access and LED lighting connecting…
Pedestrian and public realm upgrades across Shrewsbury town centre: Murivance, Claremont Bank, Town Walls and Belmont, and the…