Dudley Road Improvement Scheme — completed McPhillips project

Dudley Road Improvement Scheme

Birmingham City Council·£19.94M·Birmingham, West Midlands·2021 – 2025

Three phases of highway, cycle and public realm improvement along the A457 Dudley Road in Birmingham, delivered beside live traffic and City Hospital between 2021 and 2025.

Birmingham City Council commissioned the Dudley Road Improvement Scheme as a major strategic investment in sustainable transport, congestion reduction and urban regeneration along one of the city’s most heavily trafficked corridors.

The A457 Dudley Road forms a principal route into and out of Birmingham and serves key destinations including City Hospital, major residential areas, education facilities and large regeneration sites. Forecast housing growth in the surrounding area further increased pressure on existing infrastructure and highlighted the need for long-term transport improvements.

The scheme was developed to support clean air objectives and modal shift by improving facilities for pedestrians, cyclists and public transport users, while also enhancing highway capacity and safety at key junctions. The programme includes upgraded junction layouts, new bus lanes, segregated cycle routes, widened footways, extensive service diversions and construction of a new pedestrian and cycle bridge at Spring Hill Canal.

McPhillips was appointed to deliver the scheme across multiple phases, working within dense urban environments, alongside live traffic, critical healthcare facilities and active development sites, while maintaining access and minimising disruption.

3
Phases delivered
5
Year programme
1
New canal footbridge

The challenge

Across all phases, the project presented substantial technical, logistical and stakeholder challenges.

The corridor passes through a very busy urban environment including City Hospital, major development sites, primary schools and utility infrastructure, including a large primary electricity substation and extensive buried services.

Heavy traffic flows on the A457 required continuous traffic management, temporary lane closures and careful sequencing to maintain network capacity, particularly during peak periods.

Utility diversions were extensive and complex, involving high-voltage cables, gas mains, multiple water mains and telecommunications networks. Site rules restricted mechanical excavation within 500mm of live services, meaning large sections of work would have been extremely time-consuming if traditional methods had been used.

Delivery of Phase 1 was time-critical due to the proximity of the 2022 Birmingham Commonwealth Games, requiring completion in advance of the event.

Phase 2 introduced further complexity through the design, manufacture and installation of a slim-profile aluminium pedestrian and cycle bridge over the Soho Loop Canal, involving international manufacture, canal closures, major road closures and coordination with senior stakeholders.

Phase 3 involved further highway realignment, drainage upgrades, new signalised junctions and integration with previously completed cycle infrastructure, all while maintaining access to City Hospital and surrounding communities.

Across all phases, the project required constant engagement with Birmingham City Council, statutory undertakers, transport operators, canal authorities, healthcare providers and the general public.

Dudley Road Improvement Scheme — The challenge
Dudley Road Improvement Scheme — The solution

The solution

McPhillips adopted a structured, multi-phase delivery strategy combining detailed planning, close stakeholder engagement and innovative construction techniques to manage risk and maintain programme certainty.

For Phase 1 at Western Road, detailed traffic and pedestrian management plans were developed to maintain access while widening the carriageway and constructing new footways, cycle routes, bus lanes, drainage systems, central reservations, lighting and signal-controlled crossings. Regular coordination meetings were held with stakeholders and statutory undertakers to manage the extensive utility diversion programme.

To address excavation restrictions around live services, McPhillips introduced vacuum excavation techniques, significantly accelerating progress while reducing risk to critical infrastructure and improving site safety.

Out-of-hours working, including weekends and nights, was implemented to minimise disruption and ensure completion ahead of the Commonwealth Games.

For Phase 2, McPhillips appointed a specialist bridge installer to act as technical liaison with the German manufacturer of the aluminium footbridge. Early engagement with Birmingham City Council, transport operators and the Canal and River Trust enabled coordinated road and canal closures to be planned months in advance. The bridge installation was successfully undertaken during a controlled Sunday evening closure, with safe viewing areas provided for senior stakeholders and the public.

Phases 2 and 3 also required delivery of long sections of segregated cycle routes, shared pedestrian and cycling spaces, tidal flow bus lanes, side-road crossing upgrades, drainage improvements, landscaping and biodiversity enhancements.

Throughout all phases, McPhillips maintained live traffic management, protected access to City Hospital and local businesses, and coordinated works with adjacent developments to minimise cumulative disruption.

Phase 4 commenced in November 2025 to complete a missing section of the segregated cycle corridor outside the City Hospital frontage and to improve parking facilities at the Treatment Centre, further extending the long-term benefits of the scheme.

The result

  • Successful delivery of Phases 1, 2 and 3 of a major transport corridor improvement scheme, with Phase 4 commenced in November 2025.
  • Completion of Phase 1 ahead of the 2022 Birmingham Commonwealth Games, ensuring full readiness for international event traffic and visitors.
  • Construction and installation of a new pedestrian and cycle bridge over the Soho Loop Canal, providing a critical link within Birmingham’s active travel network.
  • Delivery of multiple kilometres of segregated cycle routes, widened footways and new bus lanes supporting sustainable transport objectives.
  • Significant reduction in congestion and improvement in traffic flow and junction safety along the Dudley Road corridor.
  • Safe delivery of extensive utility diversions and highway realignment works with no compromise to critical services including City Hospital operations.

The scheme has delivered long-term economic and social value by supporting clean air targets, encouraging walking and cycling, improving public transport reliability and enhancing access to key healthcare and development sites.

Innovative use of vacuum excavation reduced risk to buried services, improved safety and significantly shortened programme durations for utility-intensive sections of the works.

Early stakeholder engagement and regular coordination meetings ensured that complex works around hospitals, schools, major utilities and transport networks were delivered with minimal disruption.

The successful delivery of the Spring Hill footbridge created a landmark piece of infrastructure and strengthened east–west connectivity for pedestrians and cyclists.

Landscape and biodiversity enhancements introduced throughout later phases have improved environmental quality along the corridor and strengthened the scheme’s sustainability credentials.

The programme has demonstrated McPhillips’ ability to manage long-term, multi-phase frameworks involving complex engineering, evolving scope and intense stakeholder scrutiny, while maintaining consistent quality and delivery performance.

Dudley Road Improvement Scheme — The resultDudley Road Improvement Scheme — The result — detail

Related case studies.

All projects
Shrewsbury Station
View project

Shrewsbury Station

Infrastructure & civil engineering·£2.5M·Shrewsbury town centre

McPhillips was principal contractor on the scheme to deliver comprehensive public realm enhancement works that delivered a strategic…

Blackheath town centre and bus interchange
View project

Blackheath town centre and bus interchange

Infrastructure & civil engineering·£1.35M·Blackheath

A £1.35M town-centre bus interchange and public realm, delivered on time and on budget with zero RIDDOR incidents and zero service strikes.

Brymbo Spine Road
View project

Brymbo Spine Road

Infrastructure & civil engineering·£2M·Brymbo

This scheme was for construction of 2000m of 6.5m wide spine road and footways to Section 38 adoptable standard enabling residential and…

60
Years · Est. 1964
McPhillips team planting trees with local schoolchildren

Building with purpose

60+ years of supporting you.

Over six decades we’ve shaped countless communities and built spaces they can be proud of. Explore the McPhillips’ Way – the people behind our projects and the principles that drive us.

Click to access the login or register cheese