Shropshire Council·£489,000·Shrewsbury, Shropshire·2012

Refurbishing Shrewsbury's Porthill suspension footbridge.

McPhillips was appointed as principal contractor to refurbish Porthill Bridge for Shropshire Council on an NEC Option B contract in March 2012. The bridge is a main pedestrian route across the River Severn in Shrewsbury town centre.

The existing steel structure dates from the 1920s and had last been refurbished in the 1980s. It comprises a 40m suspended span over the river with an approach span at each end — the river span carried on four main cables with vertical steel suspenders, supported on steel lattice towers at both banks, and a timber deck carried on lattice girders and steel transoms.

40m
Suspended bridge span
300m²
Steelwork shot-blasted
10t
Defective steelwork replaced

The refurbishment

A safe means of working over the river — without allowing any waste or materials to enter it — had to be devised within tight limits (under 789kN vertical and 180kN maximum wind loading, with an 80m² encapsulation limit). Working with our scaffolding sub-contractor, McPhillips designed a temporary-works solution suspended from the bridge using lightweight aluminium components and a monoflex membrane, giving symmetrical loadings on the structure.

Working systematically from both ends, we removed the existing 3m-wide timber deck and carried out class SA2 blasting on 300m² of the structure, cutting out and replacing 10 tonnes of defective steelwork bolted and welded in situ. A 20-year guaranteed three-coat paint system was then applied — a high-build aluminium epoxy primer, a high-build epoxy undercoat and an acrylic polyurethane gloss finish.

A replacement hardwood timber deck was installed with an Instagrip non-slip surface, and new lighting added — floodlights to both towers and rope lighting to the cable suspenders. The bridge was closed during the works, with a water taxi provided on demand between the riverbanks.

Porthill Bridge — The refurbishment

Project gallery.

Related case studies.

All projects
Shrewsbury Station
View project

Shrewsbury Station

Infrastructure & civil engineering·£2.5M·Shrewsbury town centre

McPhillips was principal contractor on the scheme to deliver comprehensive public realm enhancement works that delivered a strategic…

Blackheath town centre and bus interchange
View project

Blackheath town centre and bus interchange

Infrastructure & civil engineering·£1.35M·Blackheath

A £1.35M town-centre bus interchange and public realm, delivered on time and on budget with zero RIDDOR incidents and zero service strikes.

Iron Lane junction
View project

Iron Lane junction

Infrastructure & civil engineering·£5.45M·Birmingham

The Iron Lane Junction Improvement Scheme was implemented to remove a major pinchpoint on the A4040 Outer Ring Road in Stechford,…

60
Years · Est. 1964
McPhillips team planting trees with local schoolchildren

Building with purpose

60+ years of supporting you.

Over six decades we’ve shaped countless communities and built spaces they can be proud of. Explore the McPhillips’ Way – the people behind our projects and the principles that drive us.

Click to access the login or register cheese