Bruderer Facility — completed McPhillips project

Bruderer Facility

Bruderer UK·£2.6M·Telford, Shropshire·November 2023 – July 2024

A new factory and showroom for Bruderer UK in Telford.

Bruderer UK appointed McPhillips as principal contractor under a JCT 2016 Design & Build contract to deliver a 10,000 square metre bespoke factory and showroom at Hortonwood, Telford, serving as the press manufacturer’s new world-class ‘competence centre’.

The facility enables live demonstrations of new presses and fully integrated turnkey solutions, supporting workforce expansion and showcasing advanced technology for automotive, aerospace and renewables sectors. The metal-framed structure on traditional dug footings using bolt boxes for frame connections was designed for heavy industrial use, incorporating a 25-ton external crane installation and a smaller 1-ton internal crane.

10,000m²
Factory & showroom floor area
25t
External crane installed
1t
Internal crane installed

The challenge

The project presented complex ground conditions and infrastructure needs requiring proactive management to maintain workflow and meet technical requirements. Winter ground conditions from November to February created challenges for drainage and foundation installation, requiring careful scheduling to maintain programme. The site required a special crane mat tested for load-bearing capacity to safely support an 80-ton crane, highlighting strict engineering safety standards. Ground insulation was required around three footings to protect against tree root intrusion, preventing structural damage and ensuring long-term structural stability.

Collaboration with local authorities was critical for timely service connections, complicated by temporary delivery restrictions during road works. Early installation of drainage before cladding represented a deliberate deviation from usual practice, requiring careful sequencing to prevent later delays and ensure welfare facilities were operational early. The installation of the 25-ton external crane and 1-ton internal crane required detailed structural reinforcement and early service integration, with the internal crane needing on-site assembly in parts before being lifted into position, reflecting significant logistical planning for bulky equipment within a finished space. Structural engineer input was essential to design reinforced concrete floors and crane rails capable of supporting crane loads without movement during testing.

Bruderer Facility — The challenge
Bruderer Facility — The solution

The solution

The project prioritised energy efficiency through building design and regulatory compliance to reduce operational costs. The site team maintained progress throughout winter ground challenges, ensuring drainage and foundations were installed early to keep on schedule.

The building incorporated insulated cladding and built-up insulated roof to lower energy bills, paired with air conditioning in office spaces as required by planning conditions. Roof-mounted photovoltaic panels were integrated as a strategic choice driven by client planning requirements to further reduce operational energy costs. Frequent visits from building control ensured compliance with insulation, reinforcing and other critical elements, reducing rework risks throughout the programme. Frame erection was completed in an impressive six days by a specialist steel contractor, with a lift shaft integrated mid-erection to accommodate vertical access requiring precise coordination with crane installation.

Structural engineer input designed reinforced concrete floors and crane rails capable of supporting crane loads without movement during testing. Utility services were embedded into the concrete floor before pouring to support ongoing operational requirements.

Collaboration with Telford & Wrekin Council and Severn Trent Water ensured timely service connections despite site access challenges.

“
We wanted our new facility in Telford to showcase our commitment to the UK manufacturing sector and our passion for delivering world class, high-speed precision presses and full turnkey solutions. McPhillips shared our desire to create a building with a difference, working with architects and our board to design a ‘statement’ look that met both our operational requirements and reflected our market-leading roots. We worked closely to make the Hortonwood site as sustainable as possible, featuring the latest thermal management technology and roof-mounted photovoltaic panels. The project was delivered on time and to budget, allowing Bruderer UK to continue supporting the manufacturing industry whilst successfully relocating from Luton to Telford.”
Adrian Haller
Managing Director, Bruderer UK

The result

The Bruderer UK facility was successfully completed in July 2024 within 37 weeks, slightly over the planned 36 weeks with an extension of time agreed due to client unavailability, reflecting flexible project management.

The project was delivered on time and to budget, allowing Bruderer UK to continue supporting the manufacturing industry whilst successfully relocating from Luton to Telford.

The building passed air testing with a score of 3.7, with insulation and efficient design significantly reducing operational costs. The 25-ton crane installation was completed successfully with reinforced concrete floors and crane rails performing to specification without movement during testing.

Bruderer Facility — The resultBruderer Facility — The result — detail

Project gallery.

Related case studies.

All projects
Hales Sawmill
View project

Hales Sawmill

Commercial & industrial·£2.6M·Battlefield

A completed and handed-over 12,000 sq ft unit — steel frame, composite cladding, glazed curtain walling and solar PV — for a local timber…

Dale Brothers
View project

Dale Brothers

Commercial & industrial·£2.6M·Hortonwood

Leading temperature-controlled food distribution specialist Dale Brothers appointed McPhillips as principal contractor to deliver a new…

Audley Avenue Retail Park
View project

Audley Avenue Retail Park

Commercial & industrial·£3.95M·Newport

McPhillips undertook the construction of this edge-of-town retail park on a brownfield site at Newport, Shropshire providing four new…

60
Years · Est. 1964
McPhillips team planting trees with local schoolchildren

Building with purpose

60+ years of supporting you.

Over six decades we’ve shaped countless communities and built spaces they can be proud of. Explore the McPhillips’ Way – the people behind our projects and the principles that drive us.

Click to access the login or register cheese