Wyre Forest District Council·£4.23M·Kidderminster, Worcestershire·2026

Public realm regeneration in Kidderminster town centre.

The Worcester Street Urban Park Connectivity Project is a central element of Kidderminster's town-centre regeneration, delivered for Wyre Forest District Council through the Future High Streets Fund. It replaced the former stepped access with a new landscaped green community space — winding footways linking Worcester Street, Bromsgrove Street car park and the adjacent Lion Fields development, a dedicated play area, improved disabled access, new LED lighting, high-quality paving, extensive landscaping and modern street furniture. Section 278 highway works on Worcester Street and Prospect Hill were completed alongside the main scheme in collaboration with Worcestershire County Council.

The new park has been named Talbot Park in honour of Charles Talbot MBE, recognising nearly 60 years of service to public life in Kidderminster and the Wyre Forest district. It opens to the public in Spring 2026 as a lasting community legacy and a key part of the Kidderminster 2040 vision.

85%
Materials reused on site
4,000t
Crushed concrete reused
15m
Hand-dug tunnel through sandstone

The challenge

The constrained town-centre site carried significant legacy conditions. Demolition arisings and made ground left by the previous contractor had to be identified, excavated and either re-engineered or removed before construction could begin, and an unknown buried concrete structure — along with several large reinforced-concrete blocks — was uncovered during excavation, requiring specialist removal without destabilising the surrounding ground.

Drainage had to be installed at depths of up to eight metres, demanding extensive excavation support and complex temporary works, while a steep gradient falling towards the town centre complicated earthworks and compaction. Throughout, the high street had to keep trading, with public safety, neighbouring buildings — including the adjacent Sense charity shop — and a live electrical substation all carefully protected.

Worcester Street — The challenge
Worcester Street — The solution

The solution

McPhillips took a proactive, sustainability-led approach. An AI-enabled drone survey, cross-checked against traditional engineering surveys, confirmed enough material was available on site to complete infill without importing aggregate, and concrete arisings were crushed and reused as 6F2 capping. Drainage was built progressively into the fill layers, and a 15-metre hand-dug tunnel through sandstone — using a timber heading frame — connected the new system to the existing highway drainage without closing the busy high street.

Precast L-shaped wall units protected the adjacent Sense unit, while precast steps and a three-tiered Tobermore dry-wall system replaced slower in-situ construction. Specialist low-vibration compaction, dust suppression, a live traffic-management plan and daily public liaison kept the town centre operating throughout.

The result

The scheme was delivered on programme and within budget, with a defect-free handover and full compliance across all KPIs. Around 85% of materials were recycled or reused on site — including 4,000 tonnes of crushed concrete — cutting waste to landfill and reducing vehicle movements, and strong local sourcing against a 30-mile target saw roughly £844,000 spent with local micro, small and medium enterprises.

Community value ran alongside the construction: pupils from Sutton Park Primary School planted bulbs in the park, commemorated with a plaque, and the team repaired and reglazed the neighbouring Sense charity shop. Talbot Park opens in Spring 2026, giving Kidderminster a welcoming, accessible green space at the heart of its regenerated town centre.

Worcester Street — The resultWorcester Street — The result — detail
Worcester Street — Feb 2026 — during works
Worcester Street — May 2026 — complete
Feb 2026 — during works May 2026 — complete

Project gallery.

Related case studies.

All projects
University Square Gardens
View project

University Square Gardens

Infrastructure & civil engineering·£900,000·Coventry

Awarded to McPhillips as principal contractor under a JCT 2016 Design & Build contract, this scheme created a new landscaped square in…

Glasshouse Lane, Kenilworth
View project

Glasshouse Lane, Kenilworth

Infrastructure & civil engineering·£1.6M·Kenilworth

A new S278 junction and widened carriageway serving a housing development, designed to later extend into a bypass easing congestion in…

Dale End, Coalbrookdale
View project

Dale End, Coalbrookdale

Infrastructure & civil engineering·£400,000·Coalbrookdale

A bespoke flood-alleviation scheme reducing the dual flood risk from a nearby brook and the River Severn, delivered around a dense web of…

60
Years · Est. 1964
McPhillips team planting trees with local schoolchildren

Building with purpose

60+ years of supporting you.

Over six decades we’ve shaped countless communities and built spaces they can be proud of. Explore the McPhillips’ Way – the people behind our projects and the principles that drive us.

Click to access the login or register cheese