The Brambles is a private cul-de-sac of fourteen occupied homes in Whitchurch whose original developer failed to build the road and sewerage to an adoptable standard before ceasing trading. Shropshire Council appointed McPhillips to put it right.
We replaced the surface- and foul-water sewers, built a new foul-water pumping station to Welsh Water specification adjacent to the original in a constrained space between occupied homes, and resurfaced the road and footways — completing five weeks early.
Works on Selly Oak New Road Phase 1B were delivered under Birmingham City Council’s Highways & Infrastructure Framework using an NEC…
A £1.35M town-centre bus interchange and public realm, delivered on time and on budget with zero RIDDOR incidents and zero service strikes.
Awarded to McPhillips as principal contractor under a JCT 2016 Design & Build contract, this scheme created a new landscaped square in…