Notice: Function WP_Scripts::add was called incorrectly. The script with the handle "twentysixteen-script" was enqueued with dependencies that are not registered: jquery. Please see Debugging in WordPress for more information. (This message was added in version 6.9.1.) in /home/mcphillipsco/public_html/wp-includes/functions.php on line 6131

New bridge at Iron Lane

Last week saw construction of the new bridge spanning the River Cole take a big step forwards at McPhillips’ Iron Lane Junction Improvement scheme in Stechford, Birmingham.

A 350 tonne mobile crane made short work of lifting 17nr, 21.5 tonne, 19m long reinforced concrete box beams onto the newly constructed parapets which will now enable us to build new carriageway in preparation for dualling the A4040 near to Stechford Retail Park.

Back

Latest News